Brazil-30T/Day Corn Kernel Production Line

By, WinTone 22 Jul, 2010

30T/Day Corn Kernel Production Line in Brazil

Project: 30T/Day Corn Kernel Production Line in Brazil
Workshop size: L× W× H: 10m × 5m × 6m, floor space: 50m², area of structure: 100m²
Installed capacity:total 74.75kw for cleaning section, peeling section, peeling and degermination section and kernel production section. 
Tons of material power consumption: 41.9KWH
Workshop environment:
Air dust concentration≤10mg/m3, dust concentration exhausted outdoor≤150mg/m3 
Products structure:
End products:corn kernels
By-products:skin miscellaneous

Get In Touch

Choose one way
Contact Us Now

Address:

No.57 Science Avenue, Zhengzhou, Henan, China;

Leave a Message

We are honored to serve and cooperate with you, please leave your needs, we will contact you as soon as possible.